两性午夜视频app-辽宁老妓女叫床高潮-邻居少妇人妻互换-领导边摸边吃-另类+亚洲+国产+欧美-另类国产t

Welcome to INTERNATIONAL MEDICAL EQUIPMENT (SHANDONG) EXPO

Power Installation Introduction

1 All exhibitiors must use electric wires,cables and electric equipment meeting national safty standards. Solid wires, stranded conductors and rubber-covered wires are prohibited. In addition, no more than 3 electrical connections are allowed in each power line.Otherwise, power transmission shall be cut down.

2 Each standard exhibition booth will be provided with power supply with the high limit set as 250w/220v to support the use of small power-driven equipment such as computers, TVs, chargers etc. Exhibitiors in need of a power strip please report to the reception desk( with RMB 100 yuan as cash pledge, which can be refunded at any time). In cases that exhibitors are in need of high-power electrical appliances such as additional illumination, electric kettles, steam irons and so forth, please go through power utilization formalities. Otherwise normal power supply during the exhibition time can not be guaranteed.

3 Feature exhibition booth owners please go to customer service center( located on the west side of 2C exhibition hall) to go through power utilization formalities. Once it is done, temporary electricity must be switched on by pavilion staff by access to the distribution box. Private operations are strictly prohibited. Each exhibition booth has been designated a nearest electricity connecting joint. Electricity users must provide connecting wires, coupling boxes, switches plugs and sockets and the like for yourselves( Self-provided material must have ground protection installation). Large electrical equipment must be equipped with electrical leakage protectors.

4 During the exhibition, charge of electricity usage should be conducted by the standard of power consumption of exhibition equipment. In addition, the voltage and power output should be determined based on nominal value labeled on the data plate. In cases that large electrical equipment is running in low-power-consumption status resulting undetermined power consumption, the maximum load of power line shall serve as referrence base.

5 The time period during which electricity is served lasts from 2:00 pm the last day of exhibits arrangements to the end of the arrangements as well as nomal open hours of the exhibition.

6 In cases where electric equipment of exhibiting companies(such as refrigerators, freezers, arched doors, gas models and other power receiving equipment )is in need of 24/7 power supply, please go to customer service center (located on the west of 2C exhibition hall) to go through 24/7 power supply formalities. We will provide special wires for your facilities and promise uninterruptible power supply.

7 Details of charges are as below:

Item Temporary power supply for Expo Setting Power supply for Expo period(including power supply for equipment test in Expo Setting) 24-hour power supply
Cost RMB150 / 3 KW RMB60 / KW Charged by 3 times of the normal power fee in the current exhibition period
Item Cost
Temporary power supply for Expo Setting RMB150 / 3 KW
Power supply for Expo period(including power supply for equipment test in Expo Setting) RMB60 / KW
24-hour power supply Charged by 3 times of the normal power fee in the current exhibition period
主站蜘蛛池模板: 日产精品区至六区在线 | 深夜影视网| 夜夜爽一区二区三 | 精品国产福利一区二区在线 | 国产嫖妓一区二区三区 | 韩国福利影视一区二区三区 | 国产激情一区二区三区在线hd | 久热这里只有精品99在线观看 | 精品国产丝瓜免费网站入口 | 亚洲精品国产电 | 欧美精品高清视 | 国产精品边做奶 | 秋霞网国产 | 免费观看日韩黄 | 青草青草久热精品视频在线播放 | 中文字幕欧美 | 福利电影网 | 999y| 日本中文字幕人成中文字幕 | a级国产乱理伦片在线观看国 | 三级网页| 欧美最猛性xxxxx免费 | 精品国产免费人成 | 国产chinesehd| 美女是黄的网址视频在线 | 亚洲一日欧美日韩中文字幕 | 被特种兵开宫灌满怀孕h | 娇妻被交换粗又大又硬彩 | 欧美日韩不卡视频合集 | a∨在线观看中文 | 福利影视大全 | 福利午夜伦理影院 | 26uuu欧美亚 亚洲欧美天堂日韩 | 噼里啪啦免 | 国产拍揄自揄精品视频网站 | 亚洲亚洲人成网站在线观看 | 国产亚洲午夜黄频 | 欧美精品香蕉在线观看网 | 国产精品美女一区二区三区 | 国产无吗一区 | 中文字幕一区二区三区日韩精品 |